ELECTROLYTIC CELL LOADING/UNLOADING PLATFORM AND ELECTROLYTIC LOADING/UNLOADING INTEGRATED SYSTEM
PCT/CN2023/126573
[DENG, Aimin 邓爱民, DENG, Zhaochang 邓曌昌, SHAO, Xiaoguang 邵晓光, WENG, Gaofeng 翁高峰, DENG, Wentao 邓文涛, YU, Zhiyan 余智艳, WEI, Dongdong 卫东东, SHEN, Zhonghui 沈忠辉, FANG, Sihua 方四化, FU, Weian 付伟岸, WANG, Shiyu 王诗宇, GAO, Shijie 高诗杰]
1688 Changxi Avenue, State-level Economic & Technological Development Zone 中国江西省南昌市经济技术开发区昌西大道1688号, Jiangxi 330013Nanchang, Jiangxi 330013;888 Qianhu Avenue, Hongjiaozhou District 中国江西省南昌市红角洲前湖大道888号, Jiangxi 330031Nanchang, Jiangxi 330031;No.1 Chengxi West Road, Cicheng town, Jiangbei District 中国浙江省宁波市江北区慈城镇城西西路1号, Zhejiang 315043Ningbo, Zhejiang 315043
The present disclosure relates to the technical field of metal smelting. Specifically, the present disclosure relates to an electrolytic cell loading/unloading platform and an electrolytic loading/unloading integrated system. The electrolytic cell loading/unloading platform comprises a supporting frame, a bottom plate, a washing device, a stripping device, and a loading/unloading robot; the bottom plate is arranged on the supporting frame, and is provided with a loading/unloading slot running through the bottom plate; the loading/unloading slot comprises a first loading/unloading slot and a second loading/a discharging slot; the first loading/unloading slot and the second loading/unloading slot are arranged at the two ends of the bottom plate in the length direction; the washing device is arranged on the surface of the bottom plate away from the supporting frame and is located between the first loading/unloading slot and the second loading/unloading slot; the stripping device is arranged on the surface of the bottom plate away from the supporting frame and is located between the first loading/unloading slot and the second loading/unloading slot; and the loading/unloading robot is arranged on the surface of the bottom plate away from the supporting frame and is adapted to grab electrode plates through the first loading/unloading slot and the second loading/unloading slot. The use of the electrolytic cell loading/unloading platform of the present invention achieves low logistics costs and a high electrolytic cell operation rate. The present disclosure relates to the technical field of metal smelting. Specifically, the present disclosure relates to an electrolytic cell loading/unloading platform and an electrolytic loading/unloading integrated system. The electrolytic cell loading/unloading platform comprises a supporting frame, a bottom plate, a washing device, a stripping device, and a loading/unloading robot; the bottom plate is arranged on the supporting frame, and is provided with a loading/unloading slot running through the bottom plate; the loading/unloading slot comprises a first loading/unloading slot and a second loading/a discharging slot; the first loading/unloading slot and the second loading/unloading slot are arranged at the two ends of the bottom plate in the length direction; the washing device is arranged on the surface of the bottom plate away from the supporting frame and is located between the first loading/unloading slot and the second loading/unloading slot; the stripping device is arranged on the surface of the bottom plate away from the supporting frame and is located between the first loading/unloading slot and the second loading/unloading slot; and the loading/unloading robot is arranged on the surface of the bottom plate away from the supporting frame and is adapted to grab electrode plates through the first loading/unloading slot and the second loading/unloading slot. The use of the electrolytic cell loading/unloading platform of the present invention achieves low logistics costs and a high electrolytic cell operation rate.
更多详情内容请
点击查看